Project planning: Difference between revisions

From Thunderforce
Jump to navigation Jump to search
Line 30: Line 30:
*XUL files tested with Usability Engineering (UE)
*XUL files tested with Usability Engineering (UE)
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
*XUL files refined
*Experiment execution
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
*Architectural refinement
*Module identification and assignment
*System code skeleton created
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
*Initial integration tests using skeleton
|}
|}
<br>
<br>
Line 52: Line 46:
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
*Detailed module designs
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
*XUL files refined
*Experiment execution
*Architectural refinement
|width="12.5%" valign="top"|
*Module identification and assignment
*System code skeleton created
|width="12.5%" valign="top"|
*Initial integration tests using skeleton
*Module unit tests
*Module unit tests
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
|width="12.5%" valign="top"|
*Integration tests needed for release pass
*Integration tests needed for release pass
*Module code
*Module code
|width="12.5%" valign="top"|
*Packaging
*Packaging
*First pre-alpha release
*First pre-alpha release
|}
|}

Revision as of 14:52, 10 July 2007

Schedule

The first release of Thunderforce is planned to occur around mid-August of this year. The details of the plan will work backwards from that release date.

The following table depicts the current schedule for Thunderforce. Note that week 18 is the week beginning on April 30, 2007. Items in the table cells indicate when those activities should be completed by, which can be by the end of the week indicated.

Please note that, as with any open-source software project, this schedule does not constitute any promise of delivery or adherence.

Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25
  • Project plan and scope
  • Context diagram
  • Use cases
  • Notional architecture
  • Identification of architectural risks
  • Experiment planning
  • Initial XML user interface language (XUL) files created
  • XUL files tested with Usability Engineering (UE)


Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33
  • XUL files refined
  • Experiment execution
  • Architectural refinement
  • Module identification and assignment
  • System code skeleton created
  • Initial integration tests using skeleton
  • Module unit tests
  • Integration tests needed for release pass
  • Module code
  • Packaging
  • First pre-alpha release